A and B can do a piece of work in 72 days. B and C can do it in 120 days and A and C can do it in 90 days. A alone can do it in
120 days
130 days
150 days
100 days
A.
120 days
Shortcut Method:
Let ABC can do it in x days.
Now,
Thus, ABC can do it in 60 days
B and C can do it in 120 days (given)
∴ A alone can do it in
â¹ 730/- were divided among A, B, C in such a way that if A gets â¹ 3/-, then B gets â¹ 4/- and if B gets â¹ 3.50/- then C gets â¹ 3/-. The share of B exceeds that of C by
â¹ 30/-
â¹ 40/-
â¹ 70/-
â¹ 210/-
The average marks obtained in a class of 50 students is 70%. The average of first 25 is 60% and that of 24 is 80%. What is the marks obtained by the last student?
90%
60%
80%
70%
In a triangle, the distance of the centroid from the three vertices is 4 cm, 6 cm and 8 cm respectively. Then the length of the smallest median is
8
7
6
5
O is the centre of the circle and and the shaded portion is x part of the circular region, then x = ?
1/12
1/9
1/6
1/4
θ is a positive acute angle and sin θ - cos θ = 0, then the value of sec θ + cosec θ is
2
The compound interest on â¹ 24,000/- at 10% per annum for interest being compounded semi-annually is
â¹ 3,783
â¹ 3,777
â¹ 3,780
â¹ 3,781